Herunterladen Inhalt Inhalt Diese Seite drucken

Packaging; Starting, Operation - Tecsis S4150 Betriebsanleitung

Mechanischer druckschalter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Packaging / 7. Starting, operation

6. Packaging

Has everything been supplied?
Check the scope of supply:
Completely assembled pressure switches
Inspect the pressure switch for possible damage during transportation. Should there be
any obvious damage, inform the transport company and tecsis without delay.
Keep the packaging, as it offers optimal protection during transportation (e.g. changing
installation location, shipment for repair).
Ensure that the pressure connection thread and the connection contacts will not be
damaged.

7. Starting, operation

Required tools:
for installation:
for switch point adjustment:
During commissioning of the pressure switch, the corresponding safety regu-
!
lations issued by the professional associations and the respective national
conditions are to be considered.
Warning
Use the pressure switch only if it is in a faultless condition as far as the safety-
relevant features are concerned.
16
Betriebsanleitung / Operating manual
wrench size 24 (S4150) and size 27 (S4250)
wrench key (2 mm) cross screwdriver (for DIN plug)
flat head screw driver 2.5 x 0.4
(for hysteresis adjustment of S4250)
GB

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Tecsis S4150

Diese Anleitung auch für:

S4350S4250S4340

Inhaltsverzeichnis