Herunterladen Diese Seite drucken

Installation Procedure - Agilent Technologies TMP Profibus 969-9261 Bedienungshandbuch

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21

Installation Procedure

TMP ProfiBus
Gateway n.1
TMP Agilent
Controller 1
Figure 3
For RS-485 cabling please refer to following figure or to the
"Connection Examples" section and to the controller's manual (note
that only 3 wires are needed and not 5):
TMP Profibus Gateway User Manual / 87-900-976-01 (F)
Connect all the Profibus devices and controllers as shown in the
figure below, being sure that all the units and controllers are
switched off.
ProfiBus Network
TMP ProfiBus
Gateway n.2
RS-485 link
TMP Agilent
Controller 2
Istallation
Technical Information

Installation Procedure

RS-485 link
TMP Agilent
TMP Agilent
Controller 3
Controller 4
18
153/178

Werbung

loading