Herunterladen Diese Seite drucken

Endress+Hauser Liquicap M Montage- Und Demontageanleitung Seite 7

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Exchange of cable on Liquicap M/Solicap M - separate version
Mounting the new cable on probe
FMI51, FMI52
1
5
GN/YE
YE
2
3
RD
4
Endress+Hauser Maulburg
FTI5x
GN/YE
YE
RD
RD
4
Without active
build up compensation
build up compensation
Installation of cable on probe:
1
Slip the adapter disc over the cable and fasten it
handtight on the cable gland.
2
Yellow wire:
Fasten the ring terminal together with the green/
yellow wire and spring ring on the circlip ring.
Pinch off the ring terminal and insolate the end of
wire with a shrinking hose.
• FTI5x with active build up compensation
Pinch off the ring terminal and dismantle the end
1
of wire. Solder it to the red probe wire"guard" and
insulate it with shrinking hose.
5
3
Green/yellow wire:
Fasten the ring terminal with a spring washer at
the circlip ring and insert the circlip ring into the
groove of probe head.
4
Red wire:
Slide the ring terminal over the thread of bunch plug
and fasten it with a hexagon nut M4.
Press the bunch plug into the adapter of probe head
GN/YE
using a bent flat pliers.
5
Mount the adapter disc with cable gland onto the
3
probe head.
ATTENTION:
YE
Turn the adapter disc approximately 3 - 4 turns
2
counter clockwise afterwards mount it onto the
probe head (torque 6.25 Nm).
RD
With active
EA0012F/00/a2/11.08
FMI51, FMI52
FTI5x without active build up compensation
View inside the probe head
(as example: FMI51, FMI52)
3

Werbung

loading

Diese Anleitung auch für:

Solicap m