Requirements
Fig. 3 :
Flush installation
EN
30
Installation
Ensure the following before installation:
· The planning process is concluded.
· The Hi-O group function and necessary terminals are defined and the DIP switch
positions are set correctly.
· The bridge is set correctly on the pins (jumper).
· The cables are identified and the wiring is completed.
· The necessary depth is available for flush installation of the switch box.
· It has been assured that protection category IP30 has been achieved after
installation.