Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 222

Preliminary works

The following illustrations are mere examples in that the space for fastening the operator and accessories varies depending on
the installation area. It is up to the fi tter, therefore, to choose the most suitable solution.
 The fi gures below refer to a standard installation with gearmotor fi tted on the left and gate opening inward. Installing the
gearmotor on the right is symmetrical.
Warning! For outward opening gate leaves, follow the chapter titled "INSTALLING AND CONNECTING FOR OUTWARD OPENING".
Set up junction boxes fi tted with cable glands and corrugated conduits for the connections coming form the junction pit.
 The number of tubes depends on the type of system and the accessories you are going to fi t.
Lay the electrical cables (see the table on types of cables and minimum thicknesses) by running them through the corrugated
conduits and junction boxes.

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Motostar SLS24

Inhaltsverzeichnis