Herunterladen Diese Seite drucken

Vitavia SIRIUS 13000 Montageanleitung Seite 12

Vorschau ausblenden Andere Handbücher für SIRIUS 13000:

Werbung

Connect the inside corner bars (2509) by sli-
ding them onto the connection point of ridge
bars (2511) and (2512) (4.9) (4.10) and posi-
tioning them onto plastic corner (2520) (4.8).
Please loosely connect to (2520) using only
the bottom bolt holes (4.8).
Connect the door runner supports (2043) to
the door runner bars (1347) using washer
(6060) (4.1) and to the Gable end using bolt
(1005) and spacer (1310) (4.3) (4.6).
4B. CONNECTING THE ROOF MIDDLE
BARS
Connect the roof glazing bars (2055) between
the eaves (4.11) and the ridge bars (4.12).
Connect the remaining roof glazing bars bet-
ween inside middle bar (2509) (4.16) (4.17) an
d the ridge bars (4.12).
Insert extra bolts into each glazing bar as indi-
cated by the circled number on each bar.
The corner braces (2056) (4.11), roof
braces (3057) (4.13), cross braces (2033)
(4.11) (4.15) and cross braces (2517) (2518)
(4.16) (4.18) (4.19) can now be connected.
Adjust the greenhouse until it is completely
square and tighten all bolts.
Please do not over tighten.
Press the end protectors (1018) onto the pro-
file ends (4.14).
5L and 5R. DOORS
Attention: Do not stand the assembled
doors on the door gliders (1014) to avoid
damaging them.
Push the door gliders (1014) onto both ends of
door bar (1360) (5.1).
Assemble the doors as shown in diagram 5.
Bolt door bar (1362) to upper bar (1359) (5.3)
and slide door seals (2021) into door bars
(2058) (5.5). Slide bolts (1500) into the bottom
of the bolt channel holding brush seals (2021)
and fix it in place using nut (1515) (5.6). Cut
the door seals (2021) to length. Please ensure
that for the inside side bar the part (2098) is
used on the left in (5L) and (2099) on the right
in (5R).
Connect door rollers (1015) to the door bar
(1362) using bolt (1304), washer (1009) and
nut (1007) (5.4).
Connect bolt (7399) at the join between both
(1347) as shown (5R).
Loosen the door supports (2043).
Now slide the door rollers into the door runner
bar (1347) (5.7). Please ensure that the door
gliders are also running on the bottom track
(5.8).
Adjust the doors so that they move freely.
6. ROOF vENTS
Connect the side bars (1065) and the top bar
(1064) depending on the glass thickness.
Up to 4 mm, see (6.1). For 4 mm and over,
see (6.2).
Place the bolts to connect the bottom bar
(1066) in the prepared holes, and then slide
the glass into the tracks in side bars (1065)
(6.3).
Now connect bottom bar (1066), and ensure
that the window is totally square before tighte-
ning all bolts.
Position the window in the ridge bar from one
end (6.4) and (6.5) and slide it to the required
position (6.6).
Connect the window sill (1063) with the extra
bolts in the roof bars (6.7).
Bolt the window opener (1067) to the bottom
bar (1066) using screws (1006) (6.8).
Place the plastic cap (1019) over the end of
the window opener (6.6) and connect both
window fixers (2016) onto the window sill
(1063) using screws (1006) (6.8).
7. GLAzING – CLEAR GLASS
Please note the already mentioned safety
precautions.
Press the glazing seals (1020) onto the alumi-
nium profiles (7.1) (7.2) and cut to length.
Begin on the roof by positioning the glass in
place and fixing it by pushing the glazing list
into position at the side (7.2). Cut each list to
the length of the glass pane.
Continue to fix the glass panes into the sides
and doors cutting the glazing list to match the
glass pane.
8. DOwN PIPES / BOLT COvERS
Push down pipe connecter (1408) into one end
of (2029) (8.1). Push the down pipe (1413)
onto (1408) and connect at the bottom using
clamp (1403) and screw (1006) (8.2) (8.3).
Connect down pipe clamp (2521) to inside
corner bar (2500) using the prepared hole and
screw (1003) (8.4). Push down pipe (1413)
onto (2520) (8.5) and then into clamp (2521)
(8.4).
At the open ends of (2029), (2501), (2502),
(2507) and (2508) push the eave end (1404)
into the eave (8.6).
Connect plastic caps (6070) by pushing them
onto all visible nuts (3002) inside the building
(8.7).
FINISHING
Fill the holes for the anchor legs with concrete.
The steel base should be connected to the
foundation using screws and plugs (not provi-
ded).
If desired, it is possible to seal the greenhouse
at the edges using silicone. Silicone is not
in cluded.
Place the warning label inside the house.
A full range of accessories is available to help
you make the most of this product. Please
contact your local stockist for details.
SAFETY NOTICE
In the event of high winds, close all doors and
vents.
In the event of heavy snowfall, clear the roof
of the building or take suitable measures to
support the roof. Heat the building in winter.
COMMENTS
For the complete protection of your new
greenhouse, we advise you to include it in
your house insurance. Please take note of
possible building rules relating to the position-
ing of greenhouses.
Please stick the greenhouse model label pro-
vided onto the door bar (1362) after success-
fully assembling this product. This information
is important in the event that replacement
parts are later required.
Please keep these Assembly Instructions in
a safe place, for future reference!
Our policy is one of continuous improvement
and we reserve the right to change the specifi-
cations without prior notice.

Werbung

loading