Herunterladen Inhalt Inhalt Diese Seite drucken

LG LZ-H015GBA2 Benutzerhandbuch Seite 21

Lüfter
Vorschau ausblenden Andere Handbücher für LZ-H015GBA2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 89
Assembly and Check after Maintenance
1. Assembly of Total heat exchanger
Securely put the corner parts (4 or 6 parts) of
the Total heat exchanger into the
holder for assembly and slide them into the
inside of the main body.
2. Assembly of air filter
Assemble the air filter into the holder structure
of the Total heat exchanger.
• Take care to ensure that surface of the Total
heat exchanger could not be damaged.
• Dusts adhered to the Total heat exchanger
may cause deterioration of Air volume.
3. Assembly of maintenance cover
Fix the cover to the right hinge and fix it to the
left side. (A nameplate is adhered toward the
reading direction).
WARNING: Turn the breaker off when
cleaning the product.
CAUTION: Gloves should be worn
when doing the maintenance work.
Maintenance and Service
Total Heat
Exchanger
Assemble the
air filter into the
holder structure.
Total Heat Exchanger
Main Body
Air Filter
Hinge
Main Body
Main Body
Holder for
Owner's Manual 21

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis