Herunterladen Inhalt Inhalt Diese Seite drucken

DENIOS. SpillGuard Kurzanleitung Seite 18

Vorschau ausblenden Andere Handbücher für SpillGuard:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The calibration process is complete after
4.
approx. 30 seconds.
2 beeps
LED flashes once a minute
LED
SpillGuard® is ready for operation.
5.3 Alarm procedure
After detecting a leak the following alarms
are given:
5 beeps, 15 s pause
Fast flashing during the pause
LED
Press the button (< 10 s)
1.
1 beep
The alarm is turned off .
18/40
SpillGuard® Quick Guide | 269803 | Rev. 0
i
INFORMATION
When handling hazardous substances,
observe the safety instructions in the
safety data sheet for the leaked hazardous
substance.
Carry out measures to clean up the leak.
1.
CAUTION
• Hazard from direct contact with the
hazardous substance
• Injury possible to hands, eyes etc
• Wear personal protective equipment (PPE)
Remove liquids from the spill sump and
2.
clean.
Check the spill sump for damage and
3.
integrity.
Fit a new SpillGuard®.
4.

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für DENIOS. SpillGuard

Inhaltsverzeichnis