5. Set-up and operation

Symbols:
Audible signal tone
Visual signal
LED
5.1. Activating and calibrating
SpillGuard®
Position SpillGuard® at the lowest point
1.
of the spill sump with the sensor surface
towards the bottom.
Press and hold the button until the signal
2.
tone is heard.
1 beep
Ø 110 mm,
Height 40 mm
140 g
3,6 V
Max. 5 years
6 mm
LED flashes quickly
LED
The calibration process is complete after
3.
approx. 30 seconds.
2 beeps
LED flashes once a minute
LED
SpillGuard® is ready for operation.
5.2. Calibration for a new location
When installing SpillGuard® in a new location
proceed as follows:
Press and hold the button until the beep
1.
is heard to switch off SpillGuard®.
1 beep
Position SpillGuard® in the new location.
2.
Press and hold the button until the beep
3.
is heard.
1 beep
LED flashes quickly
LED