Herunterladen Diese Seite drucken

dirna Bergstrom bycool green line INTEGRAL POWER Montageanweisungen Seite 24

Vorschau ausblenden Andere Handbücher für bycool green line INTEGRAL POWER:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INTEGRAL POWER
EN
Mount (4) valves in wastewater pipes.
1
1
Secure with (4) clamps and (4) screws as
2
indicated.
2
Check that they do not interfere with the roof
3
of the cabin, thus ensuring no obstruction.
WASTEWATER PIPES
24
Air conditioning for vehicles
1
2

Werbung

loading