Herunterladen Diese Seite drucken

dirna Bergstrom bycool green line INTEGRAL POWER Montageanweisungen Seite 20

Vorschau ausblenden Andere Handbücher für bycool green line INTEGRAL POWER:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INTEGRAL POWER
EN
Position the front without fully tightening.
11
Position the console and align the unit. Once
12
aligned, remove the console.
Secure the attachment supports by turning
13
the nuts to tighten the exterior EPDM seal
(Point 4) of the unit between 3 mm and 6
mm; the seal should have a thickness of
between 19 and 22 mm.
Important: The EPDM seal must be
tightened with the base of the Compact, as
shown in the diagram, in order to prevent
any leakages of air inside the cabin.
3-6mm.
Cabin roof
Turn the nuts until the
rubber seal is tight
10
between 3 and 6 mm.
EPDM seal
10 mm*
(*) (approx. after tightening)
11
12
13
12
20
Air conditioning for vehicles
Check the
compression of the
EPDM seal using
a flexometer in the
four corners.
10

Werbung

loading