Herunterladen Inhalt Inhalt Diese Seite drucken

Fakir QS 1200 Bedienungsanleitung Seite 35

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly
1. The both, as a transportation protection in the
front grid put the parts of styrofoam, remove.
2. The quartz heater must be installed only in a ho-
rizontal position on the wall. Do not install on the
ceiling or vertically or on wall sockets. Do not use
the heater when it is in uneven position.
3. During installation respect the minimum distances
indicated in Fig. 1.
4. To be able to fasten the quartz heater to the wall,
both lateral clamping screws must be loosened for
the swivelling hinges something (Fig. 2). Loose
the both screws to remove the console-cover.
Now you can enlarge the angle of traverse and tip
the quartz heater forwards.
5. Taking into account the fewest distances (Fig. 1)
marks the bores for the dowels. Distance of the
bores 260 mms and insert the dowels (Fig. 3).
Fix now the quartz heater with the dowel screws
at the wall. Use the enclosed cable-coupling and
plug in following way: Put the cable-coupling in
the circular console hole at the side of the con-
nection. Put the plug in the other circular console
hole. Fix the cable in the connection-terminal. You
must fit a separate device at last at 3mm range
for each terminal. For example: switch – circuit
protection – switch – protection with a recognizab-
le coordination. Fix the electric connection at the
free cable of the connection-terminal. The con-
nection of the protective conductor is absolutely
necessary for safety reasons and must be perfor-
med correctly.
13

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bst 600

Inhaltsverzeichnis