Herunterladen Inhalt Inhalt Diese Seite drucken

Minimum Clearance Distances - Fakir QS 1200 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Minimum clearance
distances
12
Assembly
ATTENTION!
Make sure that the device is not operated near furni-
ture, curtains or other flammable objects. Keep a mi-
nimum distance to other objects, walls and ceilings.
Keep away the heater from combustible materials
such as curtains, carpets, plastics etc. and keep to
distance of at least 150 cm between front grid and
flammable subjects in the radiation area.
Safety distances according to VDE 0100, part 701 and
the regulations of the regional utilities and the
minimum distances according to Fig. 1 are to keep.
ATTENTION!
The quartz heater may only be connected to the mains
and put into operation when it has been properly ins-
talled in a horizontal position on the wall . Turn in on
bevore mounted correctly and not in the horizontal po-
sition may cause damage to the heating elements

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bst 600

Inhaltsverzeichnis