Herunterladen Inhalt Inhalt Diese Seite drucken

Tecno-gaz ONE Anwenderhandbuch Seite 35

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 69
ENGLISH
Place the unit on a horizontal surface, away from heat sources.
Connection and putting into service:
The electrical connection must be performed according to technical rules in force.
- Ensure that the value of the measured voltage is equal to the one written on the
marking label of the machine.
-
Ensure that electrical installations are equipped with an efficient grounding.
-
To make the thermosealing operational, load in the roll and place it in its head
dispensers:
Fig.2
- Loosen the wing nuts (A) and release the dispensers (B) by moving levers (C);
- Place the roll of envelopes to seal the roll (B);
- Place the roll on thermosealing;
- Attach the roll (B) moving the levers (C) and tighten the wing nuts (A);
11

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Tecno-gaz ONE

Inhaltsverzeichnis