Herunterladen Inhalt Inhalt Diese Seite drucken

Battery & Fuse Replacement - Perel Tools EVM850 Handbuch

Digitalmultimeter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

7. BATTERY & FUSE REPLACEMENT
When"
" is displayed, the battery should be replaced.
Fuses rarely need replacement and blown fuses almost always result from human error.
To replace the battery or fuse (200mA / 250V), simply remove the 2 screws at the back of the case.
Remove the old specimen and insert the new one.
Please remember to observe battery polarity.
8. WARNING
Before attempting to open the case, verify if the test leads have been disconnected. Before using
the meter, please remember to close the case and tighten the screws properly in order to avoid
electroshocks.
9. ACCESSORIES
• User manual
• Set of test leads
• Gift box
• 9V battery
• Holster
The information in this manual is subject to change without prior notice.
Aan alle ingezetenen van de Europese Unie
Belangrijke milieu-informatie betreffende dit product
Dit symbool op het toestel of de verpakking geeft aan dat, als het na zijn levenscyclus wordt
weggeworpen, dit toestel schade kan toebrengen aan het milieu.
Gooi dit toestel (en eventuele batterijen) niet bij het gewone huishoudelijke afval; het moet bij
een gespecialiseerd bedrijf terechtkomen voor recyclage.
U moet dit toestel naar uw verdeler of naar een lokaal recyclagepunt brengen.
Respecteer de plaatselijke milieuwetgeving.
Heeft u vragen, contacteer dan de plaatselijke autoriteiten inzake verwijdering.
EVM850
EVM850 – DIGITALE MULTIMETER
8
PEREL

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis