Herunterladen Inhalt Inhalt Diese Seite drucken

Perel Tools EVM850 Handbuch Seite 5

Digitalmultimeter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

5.1. DC VOLTAGE
Range
200mV
2V
20V
200V
600V
Overload protection: 250Vrms for the 200mV range and 600Vdc or rms ac for other ranges.
5.2. DC CURRENT
Range
200ùA
2mA
20mA
200mA
10A
Overload protection: F 200mA / 250V fuse. (no fuse for the 10A range).
5.3. AC VOLTAGE
Range
200V
600V
Overload protection: 600Vdc or rms ac for all ranges.
Frequency range: 40Hz to 400Hz. Response: average, calibration in rms of a sine wave.
5.4. DIODE & CONTINUITY
Range
Overload protection: 250Vdc or rms ac
EVM850
Resolution
100µ V
1mV
10mV
100mV
1V
Resolution
0.1µ A
1µ A
10µ A
100µ A
10mA
Resolution
100mV
1V
If continuity exists (less than 60Ω), built-in buzzer will sound
Displays the diode's approx. forward voltage drop
±0.5% of rdg ± 2 digits
±0.5% of rdg ± 2 digits
±0.5% of rdg ± 2 digits
±0.5% of rdg ± 2 digits
±0.8% of rdg ± 2 digits
±1% of rdg ± 2 digits
±1% of rdg ± 2 digits
±1% of rdg ± 2 digits
±1.5% of rdg ± 2 digits
±3% of rdg ± 2 digits
±1.2% of rdg ± 2 digits
±1.2% of rdg ± 2 digits
Description
5
Accuracy
Accuracy
Accuracy
PEREL

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis