Herunterladen Inhalt Inhalt Diese Seite drucken

Minimum Clearance - LG ESS Home 10 Installationsanleitung

Vorschau ausblenden Andere Handbücher für ESS Home 10:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
18

Minimum Clearance

2
This product must be installed with clearance at the left, right, top, bottom and front of the product
as shown in the figure.
Only the battery can be installed at the bottom clearance space of the product. If you install the
battery unit at the bottom clearance space, leave the clearance space between the battery and the
product more than 300 mm.
Be sure not to block right side of the installed PCS. Risk of serious injury due to high temperature.
Minimum clearance (dual batteries)
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
1 6 0 0 m
m
3 0 0 m m
1 6 0 0 m
m

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ess home 8D008ke1n211D010ke1n211

Inhaltsverzeichnis