Herunterladen Inhalt Inhalt Diese Seite drucken

Swagelok M200 Bedienungsanleitung Seite 7

Vorschau ausblenden Andere Handbücher für M200:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 15
Certificate Generation
A certificate will be generated in English when all three
functions have been performed: current calibration,
voltage calibration, and weld head speed verification
Press Detailed Information on the Service tab to display
the Detailed Information screen The Field Calibration
Certificate Date will match the last date all three functions
were performed
Choose one of the following to view the certificate:
■ Press View The certificate will display on screen
Fig 10
■ Press Print A short form version of the Certificate of
Field Calibration will print to the internal printer The full
version of the certificate does not print
■ Press Copy to USB The certificate file will be saved
to the USB connected to the M200 The file path on
the USB will be \SWS-M200\User Files\Certificate The
file name is the date, the M200 serial number, and the
words "FieldCalibrationCERT", for example "2012-10-
03 M005503 FieldCalibrationCERT"
Insert the USB on a PC to open the write-protected
certificate It can then be printed as a letter-size
document Fig 11
Panel Meter Calibration
The panel meter on the calibration unit may be removed
for calibration if required by your quality assurance
requirements Remove the panel meter from the
calibration unit and send it to the manufacturer or an
accredited company for calibration
Removal of Panel Meter
1 Remove power to the M200 and the calibration unit
2 Remove the welding cables and wire harness from the
calibration unit
3 Loosen the two screws on the panel meter one or two
turns and slide the panel meter out of the calibration
unit Fig 12
4 Remove the wires from the back of the panel meter by
pushing underneath the corner of the connector body
with a flat-head screwdriver and pushing up on the
connector Fig 13
NOTICE
Do not force the connector or it will be damaged.
Installation of Panel Meter
1 Replace the connectors in the panel meter according
to the label on the top of the meter
2 Slide the panel meter into the calibration unit
3 Tighten the two screws on the panel meter
Fig. 10 — Certificate on Screen
Cert
tificate of
Th
his certifies that the fo
ollowing Swagelok W
elding System M200
in accordance with
h instructions MS-CRD
Cali
ibration Da
Nomina
l AC Input Voltage:
B e
e f o r e C a l i b r
Feature
Un
its
Setting
Output
Error
E
2.0
1.9
-0.1
5.0
4.9
-0.1
10.0
10.0
0.0
25.0
25.0
0.0
Welding
Am
mps
Amps
50.0
50.0
0.0
75.0
75.1
0.1
100.0
100.0
0.0
160.0
162.4
2.4
Volts
VD
DC
25.0 A
9.9
0.0
Speed
RP
PM
12.000
Eq
uipment Used
SW
WS-M200-CAL
Cu
rrent Meter
Vol
lt Meter
SF-07-
177, Rev. -, DCN #: 12-0
027395
Fig. 11 — Example of Calibration Certificate Printed via PC
Screw
Fig. 12 — Panel Meter Screws
Connector
Fig. 13 — Panel Meter Connectors
f Field Ca
alibratio
n
power supply has be
en calibrated using th
he SWS-M200-CAL c
calibration stand
D-0198 and M200 Ap
pplication Software Ve
ersion 2.45.
ate: 2012-O
October-29
9
Model Number:
:
SWS-M200
Serial Number:
:
M5500
220
r a t I o n
A f t e r C a
l i b r a t I o n
Toleran
nce
Acceptable
e?
Output
t
Error
Tolerance
T
Acce
± 0.5
5
YES
2.0
0.0
± 0.5
± 0.5
5
YES
5.0
0.0
± 0.5
± 0.5
5
YES
10.0
0.0
± 0.5
± 0.5
5
YES
25.0
0.0
± 0.5
± 1.0
0
YES
50.0
0.0
± 1.0
± 1.5
5
YES
75.0
0.0
± 1.5
± 2.0
0
YES
100.0
0.0
± 2.0
± 3.2
2
YES
160.0
0.0
± 3.2
± 0.5
5
YES
9.9
0.0
± 0.5
12.000
0.000
± 0.050
Serial / I.D
D. Number
CAL01000
00
25611-02
275a0058
Calibrat
ion Completed By
y:
Jo
oe Swagelok
Screw
eptable?
Y
YES
YES
Y
YES
Y
YES
Y
YES
Y
YES
Y
YES
Y
YES
Y
YES
Y
YES
Y
7

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Swagelok M200

Inhaltsverzeichnis