NOTES FOR THE INSTALLER

ATTENTION: befor e performing an y
intervention, make sur e the electric
power supply is disconnected
ATTENTION: befor e performing an y
intervention, make sur e the necessar y
protective devices are available
ATTENTION:The appliance must be
installed in compliance with national
process plant engineering.
ATTENTION: the electric connections
and installation must be carried out
by qualified staff capable of installing,

INSTALLATION- CONNECTIONS

REFRIGERANT CONNECTIONS

This air conditioner uses the R410A
refrigerant gas.
Before an y type of inter vention, c heck
the type of r efrigernat gas loaded in
the outdoor unit. Onl y use equipment
suitable for the gas used.
Do not use differ ent gas to r efill the
existing r efrigerant. T he follo wing must
be respected:
- Seal all open ends of the pipes with
a plug or other making sure it is
connected properly.
- Pay attention during the connection of
pipes making sure that w ater, dirt etc.
do not enter in to pipes or in the system.
- The pipes connected to the indoor and
outdoor unit must be new.
The thic kness of the pipes must be
0.8mm or more.
- Use only R410A refriger ant gas in
compliance with that alread y loaded
in the outdorr unit w hen refilling the
existing refrigerant gas. Never add oil to
the system.
- To prev ent accidental loading of other
gases, the outdoor units loaded with
R410A refriger ant gas are equipped
with a three w ay v alve connection
service with a diameter of (1/2"UNF).
To prepare the copper pipes, proceed as
follows:
- use copper pipes with a thic kness of
at least 0.8mm, new and thermically
isolated.
ADDITIONAL CHARGES
9000 BTU/h
12000 BTU/h
Load for each meter above 5m
20g/m
20g/m
18000 BTU/h
24000 BTU/h
Load for each meter above 5m
20g/m
Attention! Note the added load on the
plate located on the outdoor unit.
31
transforming, upgr ading and performing
m a i n t e n a n c e o n t h e s y s t e m a n d
capable of ensuring safety and corr ect
functioning.
ATTENTION: Install a gener al s witch or
electric plug that allo ws the complete
interruption of the appliance.
Indications for a correct installation of the
appliance follow.
The perfection of all installation
interventions are left to the experience
of the installer depending on the special
The diameter of the pipes and the cou-
pling torque is as follows:
9000
(3/8) 31-35Nm
12000
(3/8) 31-35Nm
18000
(1/2) 50-55Nm
24000
(5/8) 50-55Nm
- cut the copper pipes to measure with a
pipe cutter;
- smooth the ends using a flaring end;
- isolate the pipes and insert the conical
nuts before countersinking;
- for countersinking use a conical pipe
flanger;
- check that the conical surface is centred
on the pipe, is smooth and does not
have an y fr actures and has a uniform
thickness.
- close the ends with tape so that dirt
does not enter.
For the refriger ant lines, proceed as
follows:
- Pay attention during the connection of
pipes making sure that w ater, dirt etc.
do not enter in to pipes or in the system.
- pass the lines, the condensate drain tube
and the electric cables throught the hole
prepared in the w all so that the ends
coincide with the units connection;
- make the refriger ant lines connections
in correspondance to the internal unit;
Standard 5m
Max 15m(9k-12k) 25m (18-24k)
50g/m
Gas line
Liquid line
9,52 x (0,8)
6,35 x (0,8)
(1/4) 15-20Nm
9,52 x
( 0,8)
6,35 x (0,8)
(1/4) ) 15-20Nm
12,7 x (0,8)
6,35 x (0,8)
(1/4) 15-20Nm
15,88 x (0,8)
6,35
x
(0,8)
) 15-20Nm
(1/4
needs.
Do not install the unit in rooms w here
flammable gas is a vailable or acid or
alcaline substances that could damage
the copper or aluminium heat exchangers
or internal plastic components.
Do not install the unit in w ork shops
or kitc hens w here v apours mixed with
treated air could deposit on the exc hange
batteries, reducing performance or on the
internal parts of the unit damaging plastic
parts.
- shape the refriger ant lines to bring
them in correspondence to the external
unit connections (please do not create
refrigerant lines curv es with a r adius
below 100 mm to a void crushing the
pipe section
- before connecting the lines with the
unit, ensure that the position is final
and then proceed in tightening using
a spanner and a loc k nut to a void
torsions on the mac hine enclosure and
be careful to clean the surfaces of the
joints in order to ensure perfect contact
between the tightened surfaces;
- connect the v acuum pump to the gas
line's connecting pin
- do not open the cocks (the vacuum must
be done on the lines and on the indoor
unit)
- create a v acuum until reac hing 760
mmHg; sia -760mmHg ;
- once all abo ve steps ha ve been
completed and after ha ving, definitely,
disconnected the v acuum pump,
completely open the coc ks oper ating
the nuts using a 4 mm hexagon male
spanner;;
- replace caps and tighten them;
- after ha ving c hecked that ev erything
is correct and the position of the lines
are final, fasten the cables and the
refrigerator lines together and anc hor
them with clamps.
(Max 10m)
(Max 10m)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis