Herunterladen Inhalt Inhalt Diese Seite drucken

Preparation For Operation; Operation / Settings - VERTO 50G272 Betriebsanleitung

Akkubohrschrauber
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 14
Use the power tool according to the manufacturer's instructions
only.
DESCRIPTION OF DRAWING PAGES
Below enumeration refers to the device elements depicted on the
drawing pages of this manual.
1. Quick-release chuck
2. Torque adjustment ring
3. Gear switch
4. Direction selector switch
5. Battery lock button
6. Battery
7. Switch
8. Lighting
9. Charging station
10. Charger
11. LED
* Differences may appear between the product and drawing.
MEANING OF SYMBOLS
CAUTION
WARNING
ASSEMBLY / SETTINGS
INFORMATION
EQUIPMENT AND ACCESSORIES
1. Battery
2. Charger
3. Charging station

PREPARATION FOR OPERATION

REMOVING AND INSERTING THE BATTERY
• Set the direction selector switch (4) in middle position.
• Push battery lock buttons (5) and slide out the battery (6) (fig. A).
• Insert charged battery (6) into the handle holder, you should hear
when the battery lock buttons (5) snap.
BATTERY CHARGING
Drill is supplied with partially charged battery. The battery should
be charged in ambient temperature between 4
battery, or one that has not been used for a long time, will reach full
efficiency after approximately 3 to 5 charge/discharge cycles.
• Remove the battery (6) from the drill (fig. A).
• Connect the charger (10) to mains socket (230 V AC).
• Connect the charging station (9) to the charger (10).
• Put the battery (6) inside the charging station (9) (fig. B).
• Once the charger (10) has been connected to mains green LED
will light up (11), signalling presence of charging voltage.
• When the battery (6) is placed in charging station (9) red LED
lights up (11), which indicates that battery charging is in progress
(fig. B).
• Green LED turns on again (11) when the battery is fully charged
(after 5 hours) or battery temperature is too high (above 45
When the battery reaches too high temperature during charging
(above 45
0
C) charging is interrupted. Charging resumes
automatically when the battery cools down. This temperature
rise inside the battery is not likely and may never occur.
Each time the battery is removed and inserted into charging
station during recharge, the charging cycle resets regardless of
the current battery level.
- 2 pcs
- 1 pce
- 1 pce
o
o
C and 40
C. New
0
C).
12
Batteries heat up strongly when charging. Do not operate just
after charging – wait for the battery to cool down to room
temperature. It will prevent battery damage.
SPINDLE BRAKE
Drill is equipped with electronic brake, which stops the spindle
immediately after the switch button (7) is released. The brake
ensures precision when screwing or drilling and prevents free
spindle rotation after switching off.

OPERATION / SETTINGS

SWITCHING ON / SWITCHING OFF
Switching on – press the switch button (7).
Switching off – release the switch button (7).
Each time the switch button (7) is pressed, the LED diode (8) lights
up to illuminate the workplace.
ROTATIONAL SPEED CONTROL
Increase or reduce pressure on the switch button (7) to adjust
drilling or driving speed while operating. Speed adjustment allows
for a soft start, which prevents dill slipping when drilling holes in
gypsum or glaze, and allows for operation control when screwing
in and out.
OVERLOAD CLUTCH
PSet the torque adjustment ring (2) in appropriate position to
permanently set overload clutch to defined torque value. When the
set torque is reached, overload clutch disconnects automatically. It
prevents screwing screws too deep or damaging the drill.
TORQUE ADJUSTMENT
• Different screws and materials require different torque to be
applied.
• The bigger the number corresponding to given position, the
bigger is the torque (fig. C).
• Set the torque adjustment ring (2) to appropriate torque value.
• Always start operation with low torque.
• Increase the torque gradually until obtaining desired results.
• Use higher settings to unscrew screws.
• When drilling, choose setting marked with the drill symbol. The
torque is the greatest with this setting.
• Knowledge how to choose appropriate torque setting comes with
practice
Setting the torque adjustment ring in the drilling position
deactivates the overload clutch.
WORKING TOOL INSTALLATION
• Set the direction selector switch (4) in the middle position.
• Hold the rear ring of the quick release chuck (1) and turn the front
ring counter clockwise. Turn until jaws spread properly and allow
to insert drill or driver bit (fig. D).
• Hold the rear ring of the quick release chuck (1), turn front ring
clockwise and tighten firmly to install work tool.
Deinstallation of tool is similar to installation, only the sequence of
actions is reversed.
Make sure the tool position is correct when installing drill or
driver bit in the quick release chuck. Use additional magnetic
adapter as an extension when using short driver bits.
LEFT – RIGHT DIRECTION OF ROTATION
Choose direction of spindle rotation with the direction selector
switch (4) (fig. E).
Right rotation – set the switch (4) to the extreme left position.
Left rotation – set the switch (4) to the extreme right position.
* In certain cases position of the switch related to rotation may be different than
specified. Please refer to graphic signs placed on the switch or tool body.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis