GENERAL NOTES
The smoke discharge and plumbing connections must be
carried out by qualifi ed personnel who can issue an installa-
tion declaration of conformity complying with national law.
In Italy it is necessary to refer to the standard declaration of
conformity conforming to Ministerial Decree 37/2008 (pur-
suant to Law 46/1990) and standards UNI 10683/2012 and UNI
10412-2/2009.
In the case of installation in a multiple-tenancy building, con-
tact the building manager before installation.
In France, it is necessary to refer to Decree 2008-1231.
VERIFY COMPATIBILITY WITH OTHER DEVICES
In Italy the boiler MUST NOT be installed in the same space
as type B gas heating equipment (e.g. gas boilers, stoves, and
equipment served by an extraction hood - ref. UNI 10683 and
7129).
In general, the boiler could create low pressure in the room,
affecting the operation of such appliances or being affected by
them.
VERIFY THE POWER SUPPLY
CONNECTION
(the plug must be accessible)
The boiler is supplied with a power cable that is to be con-
nected to a 230V 50 Hz socket, preferably fi tted with a magne-
tothermic switch.
The electrical system must comply with the law; particularly
verify the effi ciency of the earthing system.
The power line must have a suitable cross-section for the boiler
power.
An inadequate earthing system can cause anomalies for which
Edilkamin cannot be held liable.
In case of problems with the electrical grid, consult an electri-
cian to evaluate the installation of a sine-wave UPS of at least
800 Va.
Power variations greater than 10% can cause problems for the
product.
AIR INLET
(to be mandatorily implemented)
The room where the boiler is located must have an air intake
with cross section of at least 80cm
of the air consumed by combustion.
INSTALLATION
2
to ensurereplenishment
POSITIONING AND DISTANCES FOR FIRE SAFETY
For correct operation the boiler must be level.
Check the load-bearing capacity of the fl oor.
The boiler-stove must be installed in compliance with the fol-
lowing safety conditions:
- fl ammability items must be kept at a minimum distance of 10
cm from the sides and back of the boiler
- highly fl ammable items must be kept at a minimum distance
of 80 cm if placed in front of the boiler
- if the boiler is installed on a fl ammable fl oor, a sheet of heat
insulating material must be placed between the boiler-stove and
the fl oor, which protrudes by at least 20 cm at the sides and 40
cm at the front.
Flammable objects must not be placed above the boiler or at
a distance that is any less than the stipulated safety distances.
If connected to wooden walls or other fl ammable materials,
the smoke exhaust pipe must be appropriately insulated with
ceramic fi bre or other similar material.