Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly/Disassembly Impeller - Internal Rotor Motor - SystemAir Thermobox KBR/F 280 Montage- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

12
| Installation
8.4
Assembly/Disassembly impeller — Internal rotor motor
If an external rotor motor is used, the motor and impeller can`t be seperated.
Important
Damage to the motor and impeller.
The ball bearing of the motor and the balanced impeller may be damaged by forceful impacts.
♦ Attach the impeller and/or the shaft extension to the shaft or the rotor without forceful impacts.
♦ Do not separate the impeller and the hub. They were balanced as one unit by Systemair.
Note:
The hub can be heated for easier assembly and disassembly, for example with a hot-air blower.
• Precondition for assembly: the wedge is in the intended groove.
• Tools: hexagon socket wrench and suitable tool for removal, torque wrench for the taper clamping bush.
1
Motor
2
Motor shaft
3
Sleeve (not available at every fan)
4
Shaft extension (not available at every fan)
5
Hexagon socket screw
6
Impeller
7
Steel hub
8
Aluminium hub
The hub is shown without impeller due to better lucidity.
1. Aluminium hub
1. Steel hub
1.
2.
6
Disassembly
2.
1
2
3
4
5
7
3.
4.
1.
2.
GB
6
8
| 002

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis