Herunterladen Inhalt Inhalt Diese Seite drucken

Cgline Monitoring Device - Ceag IP65 Montageanleitung Und Bedienungsanleitung

Led einzelbatterieleuchte 6811 1-3/d led cgline
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

To fathom batteries life please note the start up date on the battery in the given data field!
Close the luminaire by taking care of the right fit of the gasket of the luminaire!

6.2 CGLine Monitoring Device

The luminaire 6811 LED CGLine is prepared for connection to the CEAG CG- Controller CGLine 400 or
the CEAG CGLine PC-Interface. An individual, distinct identification number (6 characters) is assigned
to every luminaire in the CGLine luminaire series.
This ID number must be transferred to the installation plan for subsequent configuration work. The
removable ID sticker in the luminaire can be used for this.
To the CG-Controller CGLine 400 or the CGLine PC-Interface maximum 4 bus cables (2-core) with up
to 100 luminaires each can be connected.
The max. data line length per strand is
0,5 mm
- 450m
2
Bus voltage:
Max.voltage drop:
Bus current
An unscreened, 2-core cable with free bus topology can be used as a data cable.
Each of the luminaires connected to the data bus cable is automatically recognised by the CG-Controller.
The CG-Controller can assign a short address to the connected luminaires, which can be polled via
the three LEDs on the luminaire.
green yellow red
TEST
The following can be started and displayed with the test-button:
- function test ON
- duration test ON/OFF
- duration test delayed
- settings of the emergencylight operating time with subsequent identification of the luminaire short
address (when data bus is connected and the CG-Controller has issued short addresses).
The delayed duration test is displayed if the luminaire is not charged without interruption for 24h or if
an duration test is started within the 24h.
For further details see the operating manual of the CG-Controllers CGLine 400 or the CGLine PC-
Interface.
Autarkic operation
Without the CG-Controller CGLine or the CEAG CGLine PC-Interface the luminaire starts after the initial
installation/mains connection the function test weekly and a duration test every three months.
After mains returns the emergency operation will stay for approx. 1 minute (delay on mains return)!
Operating Instructions
Self contained LED luminaire IP65
6811 1-3/D LED CGLine
1,0 mm
- 900m
2
22,5VDC
13VDC
400mA
1,5 mm
- 1300m
2
CEAG Notlichtsysteme GmbH
12

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis