Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - Vision TECHCONNECT CONTROL Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für TECHCONNECT CONTROL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18

INSTALLATION

1.
FIT LABELS Use flat-head screwdriver to unclip clear button covers, then apply labels as
shown:
2.
SELECT POWER SOURCE The control module is set to be powered by mains power by
default. If you choose to power with 2 x AAA batteries (not included) move switch inside
the battery compartment to BATT.
NOTE 1: If powered by batteries buttons will only light when pressed.
NOTE 2: If powered by mains ensure batteries are not left in device.
3.
CONNECT CABLES Connect appropriate cables and fit the module into the surround. In
very simple installations it may not be necessary to connect any cables.
7
TC3-CTL_manual_en.doc

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis