ORDERING SPARE-PARTS
The spare parts must be ordered only by fax
using the enclosed modulate "R1" complete with
all the data required in order to ensure the rapid
despatch of spare parts.
IMPORTANT
For
electrical
components
220V/230V/240V 50 Hz supply (check on the
specification plate of the defective part), add to
the order code the letter corresponding to the
rating required as given in the following table:
A
220V/230V 60Hz.
B
240V 50Hz.
C
200V 50Hz.
D
200V 60Hz.
E
190V 50Hz.
F
115V 60Hz.
G
110V 60Hz.
H
208V 50Hz.
I
24V 50Hz.
L
240V 60Hz.
M
254V 50Hz.
Example 1:
coil remote control switch is required.
A 230V/50Hz
Complete order information:
Machine model: Press Type .....
Registration No. 110227
Code No. 04775-coil remote control switch
230V/50Hz
1 piece
Example 2:
The same coil, but 254V, 50 Hz.
Complete order information:
Machine model: Press Type .....
Registration No. 110228
Code No. 04775/M coil remote control
switch 254V/50Hz
1 piece
N.B.
1. The parts that appear in this manual without
an accompanying code number ARE NOT
AVAILABLE from stock.
2. The codes "POS.16" or "POS. 20" etc. that
appear next to some parts have nothing to do
with the spare part code for these parts, and
should not therefore be quoted in orders for
spare parts.
3. The specifications, the descriptions and the
illustrations contained in this booklet are not in
any way binding. due to continuous research
and development to improve our products, the
manufacturer may alter specifications without
previous notice.
C H A P T E R 4
other
than
for
Page 4-12
STORAGE OR DEMOLITION
In case of a long period storage, it is necessary
to
disconnect
the
pneumatic feeding sources.
Machine with boiler:
a) Drain the boiler, the condensates tanks and
also the water-feeding tank (if existing).
b) Drain all the water left into the pump, by
unscrewing the hexagonal screw on the lower
side of the pump casing (the side of the water
feeding), then screw again.
c) Carefully clean the internal walls of the boiler
of any sediment or scaling.
d) Clean the boiler connections and pipes to
remove any scaling.
e) When
all
these
completed, turn off the water feeding valves
and the drainage valves.
Machine without boiler:
a) Drain the condensates tank (if existing).
b) Clean all connections removing any scaling.
c) Turn off all the steam feeding valves and the
of condensate return valve.
d) Drain the air inside the air filter cup.
Carefully refit all the panels of the machine and
cover it with a cloth to shelter from the humidity
and dust.
In case of demolition of the machine, proceed
as follows:
a) Drain the boiler, the condensate tank and the
water-feeding tank directly into the sewerage
system after having made sure that no
harmful impurities are inside the water.
b) Remove all the electric, pneumatic and
hydraulics components from the panels where
they are fixed.
c) Collect into proper container the following
parts: plastic, bakelite, cast iron, iron, copper,
brass, steel, fabrics, rubber etc. and take
them away according to the rules in force.
We trust that these few pages will be of
use to you and wish you 'Buon lavoro!' as
we say in Italy — May your work go well!
E N G L I S H
hydraulics,
electric
operations
have
been
Technical Office
and

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Pony CCP

Inhaltsverzeichnis