Herunterladen Inhalt Inhalt Diese Seite drucken

Changing The Preload Of The Shock; Changing The Shock Spring - SHERCO 250 SE/R Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

CHANGING THE PRELOAD OF THE SHOCK

REAR SHOCK KAYABA (FACTORY)
Remove and clean the rear shock unit (
Loosen the collar
.
1
Loosen / tighten the red plastic ring
Loosening
one turn
Indications
Tightening
one turn

CHANGING THE SHOCK SPRING

Remove and clean the rear shock unit (
Select and install a spring based on your weight.
Spring Rate
Rider Weight (with equipment) : 65-75kg
Rider Weight (with equipment) : 75-85kg
Rider Weight (with equipment) : 85-95kg
Reinstall the shock.
Adjust the sag (
p.104)
Adjust the static deflection (
Remove and clean the rear shock unit (
Loosen the collar
1
Loosen / tighten the red plastic ring
2
depending on the length required..
Indications
Tighten the collar
Reinstall the shock (
Recheck the settings (
p.114).
depending on the length required..
2
Decreases the ove-
rall length by 4mm.
Increases the overall
length by 4mm.
p.116)
p.104)
.
1
Loosening
one turn
Tightening
one turn
(tightening torque: 5 Nm).
1
p.117)
Tighten the collar
1
5 Nm).
Reinstall the shock (
Recheck the settings (
48N/mm
51N/mm
54N/mm
p.116).
2
Decreases the ove-
rall length by 3mm.
Increases the overall
length by 3mm.
p.104)
(tightening torque:
p.117)
p.104)
107

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

300 se/r

Inhaltsverzeichnis