Herunterladen Inhalt Inhalt Diese Seite drucken

BINZEL-ABICOR ABIROB W300 Betriebsanleitung Seite 35

Schweißbrenner-system
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
®
ABIROB
W
6.3 Equipping the cable assembly
1
10
®
1
ABIROB
W torch neck
®
2
ABIROB
W cable assembly
3
Air-blast hose
4
Connecting nut of central connector
Fig. 6
Equipping the hose assembly
6.4 Mounting the machine side connection
2
9
5
Central connector
6
Support sleeve
7
Complete liner
NOTICE
• Select the proper wire type and the related wire guide for your
application.
• For cutting the wire size and for correct mounting, please observe the
following chapters:
 See 9 Maintenance and cleaning on page EN-17
1 Lay down the cable assembly (2) straight.
2 Slide complete liner (7) from central connector (5) into the torch neck (1)
as far as it will go.
If required, connect the EMERGENCY STOP cable (9) of the CAT robot
mount (10) to the hose assembly (2) .
 See Fig. 6 Equipping the hose assembly on page EN-13
Check once again whether the wire guide has been fitted correctly.
1 Mount central connector (5) to the wire feeder and secure it with the
connection nut (4).
2 Fasten the air-blast hose (8) to the air-blast and spraying unit or the air-blast
valve. Seal the connection gas-tight if the "Air-blast" option is not used.
6 Putting into operation
3
8
8
9
10 CAT robot mount
4
Wire feed
EMERGENCY STOP cable
EN - 13
5
6
7

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für BINZEL-ABICOR ABIROB W300

Diese Anleitung auch für:

Abirob wAbirob w500

Inhaltsverzeichnis