Herunterladen Inhalt Inhalt Diese Seite drucken

Before Installation - Schulte Heizstab 5 Betriebsanleitung

Heizpatrone und elektroheizkörper
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

24. Regularly check if the radiator is filled with a liquid. Reg-
ularly check the device for damage to ensure it is safe
to use.
25. Do not allow flooding into the heating element casing.
26. The device must be disconnected from the mains dur-
ing cleaning and maintenance.
27. The pressure in the radiator should not exceed 1 MPa
(10 bar). Ensure that an air cushion of ca.8% of its vol-
ume is preserved.
Installation or disassembly
Detailed information on all possible ways
of the device installation or disassembly, is
available from the manufacturer the item.
Below are the most important require-

Before installation

1. Read chapter: Guide to safe installation.
2. The device is intended for operation in
a vertical position with heating element
turned upwards.
3. Use a suitable heating medium (water /
ments and guidelines which should be
strictly followed in order to ensure a long
term, unfailing operation of device.
glycol mixture).
4. Do not turn the device on if not im-
mersed in water or other liquid as it
could cause damage to thermal fuse
and will not be liable for claim under
warranty.
37

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis