PRELIMINARY CHECKS (fig.1, pag.2)
• Before starting the installation make sure that the structure which is to
be automated is in good working order and respects the local stand-
ards and regulations in force.
• To this end ensure that:
- The surface of the sliding gate "A" is smooth and has no protrusions up
to a distance of 2,5 metres from ground level. Protrusions on the gate
surface which are not greater than 3 mm and have rounded edges are
acceptable. If the surface of the gate is not smooth, the entire height
up to 2,5 metres must be protected by two of the following devices:
a) photoelectric cells
b) contact safety buffer
- the distance "b" between the fixed parts and sliding parts of the instal-
lation must not exceed 15 mm.
- the runner guide "C", preferably round, should be securely fixed to
the ground, completely exposed and free of any imperfections which
could inhibit the correct movement of the gate.
- when the gate is closed a space of 50 mm "D" must remain for the
entire height of the front part of the gate and a mechanical travel limit
"E" must be positioned on the upper part of the gate.
The free space "D" can be covered with a rubber anti-crush buffer "F"
or better still a pneumatic or photoelectric contact safety buffer.
- if the gate slides past a fixed structure "G" which has railings or bars
leaving open spaces, it must be protected in one of the following
ways:
1) distance "H" greater than 500 mm: no protection required;
2) distance "H" between 500 and 300 mm: wire mesh fencing "I" or
punched metal plating "L" with an opening which does not allow the
passage of a 25 mm diameter sphere "M" must be fitted;
3) distance "H" smaller than 300 mm: wire mesh fencing "I" or punched
metal plating "L" with an opening which does not allow the passage
of a 12 mm diameter sphere "M" must be fitted. The wires of the
mesh "I" must not have a cross-section of less than 2,5 mm
punched metal plating "L" must not have a thickness of less than 1.2
mm. Protection is not necessary for the area "P" if the fixed structure
with railings or bars is over 2,5 m above the ground.
- check the gate components, replace any worn or damaged parts and
then lubricate them.
- using a spirit level "N" check that the castor guide is in square.
- the upper runner guide "O" must have the correct play for the gate
and must not inhibit the gate's sliding action.
Caution! It is the installer's responsibility to check all criti-
cal danger points, to take action and to install any devices
needed to guarantee the safety of all people using the gate
(risk analysis).
Caution! Check that a mechanical travel limit (absolutely nec-
essary) has been fitted in the opening direction and that it cor-
responds to the maximum travel distance "P" of the gate. The
travel limit must guarantee anti-derailment and gate stability.
USER INSTRUCTIONS
Attention! Only for EU customers - WEEE marking.
This symbol indicates that once the products life-span has expired
it must be disposed of separately from other rubbish. The user
is therefore obliged to either take the product to a suitable dif-
ferential collection site for electronic and electrical goods or to
send it back to the manufacturer if the intention is to replace it
with a new equivalent version of the same product.
Suitable differential collection, environmental friendly treatment and disposal
contributes to avoiding negative effects on the ambient and consequently
health as well as favouring the recycling of materials.
Illicitly disposing of this product by the owner is punishable by law and will
be dealt with according to the laws and standards of the individual member
nation.
During the opening/closing manoeuvre check for correct operation and
activate the emergency stop button in case of danger.
During blackouts the gate can be released and manually manoeuvred
using the supplied release key (see manual release fig.9).
Periodically check the moving parts for wear and tear and grease if
required, using lubricants which maintain their friction levels unaltered
throughout time and are suitable for temperatures of -20 to +70 °C.
Eventual repair work must be carried out by specialised personnel using
original spare parts. The appliance is suitable for continuous operation.
Note: The newly installed system is guaranteed and respects the laws
and standards in force. It is however the user's responsibility to maintain
the efficiency of the installation. You are advised to have the installation
checked at least once a year by qualified personnel.

INSTALLATION INSTRUCTIONS

• The geared motor can be positioned either to the left or to the right of
the passageway.
Important: read the paragraph "INSTRUCTIONS FOR POSITION-
ING THE UNIT".
Anchoring the unit (fig. 4, 5, 6)
Important! Check the exact anchoring position with respect to the
alignment of the sliding gate.
• Run the piping and connection wires to the position where the motor
is to be installed.
• Attach the anchor bolts to the base plate "A" allowing them to
All rights reserved. Unauthorised copying or use of the information contained in this document is punishable by law
protrude by 40 mm and then tighten down using the supplied M8
nuts.
• Prepare a cement plinth, in the position where the motor is to be
installed, with a depth of 350 mm (the base should protrude by
about 25 mm to avoid damage by pools of water building up under
the appliance).
• Insert the base plate making sure that:
- the electrical cables pass through the hole "b";
- the anchor bolts "C" are immersed into the cement base and the
base plate is perfectly level;
- the four protruding 50 mm threaded bolts are perpendicular
to the base plate;
- the surface area of the base plate is clean
and free of cement residue.
All rights reserved. Unauthorised copying or use of the information contained in this document is punishable by law
All rights reserved. Unauthorised copying or use of the information contained in this doc
and the
2
C
5
SCALA: 1:2
• To install the geared motor proceed as follows:
Drawing number :
DI0065
- Unscrew the four M8 nuts on the four threaded bolts (previously used
Product Code :
SL4024
to block the anchor bolts) to about 15
P.J.Heath
Date :
Draft :
08-06-98
mm from the base of the anchor
CARDIN ELETTRONICA S.p.A - 31020 San Vendemiano (TV) Italy - via Raffaello, 36 Tel: 0438/401818 Fax: 0438/401831
plate. Then insert the four washers
and allow them to rest on the nuts.
- Position the geared motor over the
four threaded bolts and allow it to
rest on the four washers.
- Fasten it to the base using the other
four washers and adjustment nuts
supplied with the kit, making sure
that the unit remains perfectly level
SCALA: 1:2
and stable. This will allow you to
Drawing number :
DI0344
adjust the height and position of
Product Code :
SL424E
the motor later on.
Date :
Draft :
P.J.Heath
17-06-2004
CARDIN ELETTRONICA S.p.A - 31020 San Vendemiano (TV) Italy - via Raffaello, 36 Tel: 0438/401818 Fax: 0438/401831
13
b
A
1
2
4
300
Description :
Prodotti Technocity
CONTROPIASTRA SL4024
5
70
Description :
Prodotti Technocity
VISTA CONTROPIASTRA SL4024
M 8
4
5
3