Herunterladen Inhalt Inhalt Diese Seite drucken

Mitsubishi Electric PCFY-P40VKM-E Installationshandbuch Seite 4

Vorschau ausblenden Andere Handbücher für PCFY-P40VKM-E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 8
A
45°±2°
B Refrigerant pipe sizes & Flare nut tightening torque
Pipe size
P40
P63
4
7~12
B
C
B
R410A
Liquid pipe
Tightening torque
14 - 18
34 - 42
34 - 42
Installing procedures
w
A
B
C
D Suspending bolt
E Washer 1
F Double nuts
ing flare nut.
Insulate carefully.
Warning:
A Flare cutting dimensions
Copper pipe O.D.
Flare dimensions
ø6.35
ø9.52
ø12.7
ø15.88
ø19.05
Gas pipe
Pipe size
Tightening torque
49 - 61
68 - 82
68 - 82
C Apply refrigerating machine oil over the entire flare seat surface.
Installing procedures
1. Slide the supplied pipe cover 2 over the gas tubing until it is pressed against the
sheet metal inside the unit.
2. Slide the provided pipe cover 3 over the liquid tubing until it is pressed against
the sheet metal inside the unit.
3. Tighten the pipe covers 2 and 3
bands 4.
A Gas tubing
E Pipe cover 3
B Liquid tubing
F Press the pipe cover against the sheet metal.
C Band 4
G Refrigerant tubing heat insulating material
D Pipe cover 2
P40
882 - 887
G
P63
1202 - 1207
P100, P125
1522 - 1527
8.7 - 9.1
12.8 - 13.2
16.2 - 16.6
19.3 - 19.7
22.9 - 23.3
Flare nut O.D.
Liquid pipe
Gas pipe
17
26
22
29
22
29
-
-

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pcfy-p63vkm-ePcfy-p100vkm-ePcfy-p125vkm-e

Inhaltsverzeichnis