Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly; Preparatory Activities; Workplace Requirements; Preparation Of The Surface - Holzmann ED 400 FD Betriebsanleitung

Metalldrehmaschine
Vorschau ausblenden Andere Handbücher für ED 400 FD:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ASSEMBLY

Please check the product contents immediately after receipt for any eventual transport damage or
missing parts. Claims from transport damage or missing parts must be placed immediately after
initial machine receipt and unpacking before putting the machine into operation. Please
understand that later claims cannot be accepted anymore.

16.1 Preparatory activities

16.1.1 Workplace requirements

The workplace has to fulfill the requirements.
Observe the safety requirements as well as the dimensions of the machine
The workplace must:
 have sufficient lighting.
 a straight, flat, floor exhibit
 with minimal vibration values (such as concrete).
 The machine should be mounted on a solid work surface which also flat, straight and vibration
(eg massive workbench)
 Provide a suitable freely accessible supply 230V / 50Hz and sufficient protection (16A).

16.1.2 Preparation of the surface

Uncoated metal machine parts have been insulated with a greasy layer to inhibit corrosion.
This layer has to be removed. You can use standard solvents that do not damage the machine
surface.
Do not use solvents based on nitrite, aggressive solvents like break cleaners or
scrubbing agents!
These damage the machine surface
HOLZMANN MASCHINEN GmbH
www.holzmann-maschinen.at
N O T I C E
ASSEMBLY
37
ED400FD

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis