Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
5....-05-DR 2890
GB
Remove the main device and accessories from the box. Also remove any packa-
ging materials that may be present.
Filling up the Heating Boiler before Use!
Before the tank cap is opened it must be ensured that the device is not under any
pressure. Please proceed as follows:
1. Open the cover on the main device and attach the
connection head (17).
2. Connect the device to a correctly installed 230 V/50
Hz power socket.
3. Switch on the steam control button (19). The green
control lamp lights up.
4. Release the pressure by using the steam switch (5).
5. Remove the plug from the socket.
6. Caution! Danger of Injury! Please open the safety
lock (4) only when no more steam comes out of
the nozzle.
Turn the lock in an anticlockwise direction.
If the device is still warm, please wait 5 minutes before
removing the seal completely. Press the seal down-
wards and turn.
Note: For your protection the safety lock has a release
device. If the pressure in the kettle is still too high, this
release device prevents it from being opened.
7. Shake any residual water out of the kettle (2). Fill fres-
hwater from the measuring beaker (9) into the kettle.
Do not overfill! Do not exceed the quantity of water
stated on the measuring beaker, i.e. 1.2 litres!
8. Re-fasten the safety lock (4).
50
24.06.2004
14:04 Uhr

Initial Operation

Seite 50

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis