Herunterladen Inhalt Inhalt Diese Seite drucken

Nibe UKV 100 Montageanleitung Seite 9

Vorschau ausblenden Andere Handbücher für UKV 100:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Volume and flow increaser
In cases where the system volume in the radiator circuit is below 20 l/kW (heat pump output at 7/45 °C) and/or the
radiator flow is choked uncontrolled, a UKV tank is installed as a volume and flow increaser. Plug any connections that
are not used. The T-coupling must be positioned as close to the UKV tank as possible.
Volume and flow increaser
P
For large houses and apartment buildings, industrial premises or similar with supply air batteries.
The accumulator tank is used as a buffer for the supply air coil. Plug any connections that are not used.
The T-coupling must be positioned as close to the UKV tank as possible.
Note! These are outline diagrams. Actual installations must be planned according to applicable standards.
99
VP1
Additional heat
Tillsatsvärme
VP1
SMO 10
93
FG
35
89
120
101
120
T
UKV 100
Docking
35
94
31
35
GB
9

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis