Herunterladen Diese Seite drucken

Ozone ANTI-G Betriebshandbuch Seite 9

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

PACKING
Unlike a reserve parachute, the ANTI-G system does not need
specific folding, however we recommend using the method shown to
ensure correct fitting and deployment.
Lay the ANTI-G on the floor, with
the mesh facing upwards.
Ensure that the central line is not
in the disabled position. Do this by
pulling the disabling line through
the bridal.
The handle should locate on the
Velcro strip with no excessive
slack in the disabling line. Fold the
canopy in half.
7
Fold the canopy in half.
Fold again from the tip toward the
middle to form a cone shape. Fold
following the line of stitching.
Fold one half over the other.
Roll the canopy from the Apex
toward the skirt.

Werbung

loading