Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Of The Equipment - FLOWMAX 16-120 F Betriebsanleitung

Vorschau ausblenden Andere Handbücher für 16-120 F:
Inhaltsverzeichnis

Werbung

2. HANDLING
Check the weight and the dimensions of the equipment
(  refer to 'Technical features' section of the instruction manual
If weight and dimensions are too important, the unloading must be carried out by means of a forklift or
any other appropriate means with a qualified personnal and in a clear horizontal area to prevent from
risks of damage injury or an accident.
The centre of gravity is not in the centre of the machine : carry out by hand a stability-test after having
lifted the whole at 10 cm / 3.937" maximum.
After the unloading, the handling of the whole (eg: elevator pump) is carried out by means of a pallet
truck taking the bottom part of the frame.
Remark : Each pump motor is fitted with a ring. The ring is designed for the hoisting of one
pump and can not be used for the handling of the complete machine.
3. STORING
Storing before installation :
-
Storing ambient temperature : 0 / +50 °C / 0 / +122°F
-
Protect the whole against dust, water trickling, dampness and shocks.
Storing after installation :
-
Operating temperature : +15 / +35 °C / +59 / +138.2° F
-
Protect the whole against dust, water tricling, dampness and shocks.

4. INSTALLATION OF THE EQUIPMENT

The machine is installed on a stable horizontal floor (for eg a concrete flag).
To avoid risks caused by static electricity, the equipment as well as its components
must be grounded.
 For the pumping equipments (pumps, pneumatic rams, frame...), a section wire of 2.5
mm² is fixed on the material. Use this wire to connect the material to "the general
ground". In case of severe environments (mechanical protection of the wire of earthing
insufficient, vibrations, mobile material...) where function damages at the ground are
probable, the user have to replace the provided wire of 2.5 mm² by a device more
adapted to its environment (wire with a more important section, bonding strip, fixing by
thimble with eyelet...),
The continuity of the ground must be controlled by a qualified electrician. If the continuity
of the ground is not ensured, check the terminal, the wire and the earthing point. Never
use the material without have solved this problem.
 In the severe cases of environments (mechanical protection of the wire of earthing
insufficient, vibrations, mobile material...) where damages of the function put at the
ground are probable, the user will have to replace the wire of 2.5 mm ² provided, by a
device more adapted to its environment (wire of more important section, bonding strip,
fixing by thimble with eyelet...),
 The gun must be 'grounded' via a material hose or an air hose. In case of spraying by
means of a gun with cup, the air hose must be conductive,
 The materials to be painted must also be grounded.
All the materials situated in the working area shall be grounded.
KREMLIN REXSON
N° : 578.001.130-UK-1103

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für FLOWMAX 16-120 F

Diese Anleitung auch für:

16-120 ft

Inhaltsverzeichnis