Herunterladen Inhalt Inhalt Diese Seite drucken

Safety Instructions; Zasady Bezpieczeństwa; During Installation; Installation Steps - Bellcome 1- Familien Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 23
4
EN
1. ATTENTION! The installation, the maintenance and the connection to the 230V/50Hz network
of the central unit (SCU) will be carried out only by authorized personnel!
2. ATTENTION! It is MANDATORY to use a 3 x 0,75 mm cable and 2 automatic fuses (6A) for
power supplying the central unit (SCU) from the 230V/50Hz network.
3. ATTENTION! During installation, connection of the central unit (SCU) to 230V/50Hz and
service, the safety fuses from the electric panel must be opened (
4. ATTENTION! DO NOT UNFASTEN THE FRONT LID OF THE CENTRAL UNIT (SCU)! DANGER OF
ELECTRIC SHOCK! Only 1 and 2 protection lids of the connections can be unfastened during
installation or service.
5. IMPORTANT! You must make the connections for F, N and
lids of the central unit (SCU) and only after these you can connect the 2 supply fuses (230V/50Hz)
6. DO NOT TOUCH the metallic parts of the wires or the terminals of the connectors from the
central unit (SCU) or from the fuses. You have to disconnect first the 6 A fuses (
the supply's phase and only then you can work with the central unit (SCU).
7. ATTENTION! Do not supply components of the installation separately (outdoor panel, terminals etc.)
at voltages higher than 14Vd.c. or directly from the network (230V/50Hz). DANGER OF ELECTRIC
SHOCK and system destruction.
8. PAY ATTENTION to the polarity of the terminals of the rechargeable battery (max. 3.2 Ah/ 12 Vd.c.)
when connecting it to the central unit (SCU).

4.1. Installation steps

Install the Outdoor Panel (APA) – Ch. 5.2.
Step 1
The electrical connections must be in accordance with the diagram from Ch. 5.2.5.
!
Install the Audio Connection Box (ACB) – Ch. 5.3. (2 and 3 Families - 3.1.2, 3.1.3)
Step 2
For connections with RJ45 connector - Ch. 5.3.2. For connections with screw connectors –
!
Ch. 5.3.3.
Install the Audio Terminal (ATA) – Ch. 5.4.
Step 3
For connections with RJ45 connector - Ch. 5.4.2. For connections with screw connectors
!
For additional audio terminals - Ch 5.4.4.
Install the Central Unit (SCU) – Ch. 5.5. Authorized personnel required! – Ch. 4
!
With the 6A automatic fuses in OFF position:
a. Place the SCU in the electric panel – Ch. 5.5.1.
Step 4
b. Make in the SCU the connections for APA, ATA (LCK, e.t.c.) – Ch. 5.5.2. (5.5.3.)
c. Make the F, N and
d. Make the F, N connections at the automatic fuses and
Step 5 Check the precision of all the connections made in SCU – Ch. 5.5.2
Step 6 Turn ON the 6A automatic fuses.
Check the LED color of SCU – Ch. 6.3. In case of red signaling, turn OFF the
Step 7
6A automatic fuses and see TROUBLESHOOTING – Ch. 7 to identify the cause.
With a voltmeter set on direct current, check the voltages on the terminals of SCU – Ch. 5.6.1.,
Step 8
APA - Ch. 5.6.2. and ATA / ACB – Ch. 5.6.3.
If the values do not match, see TROUBLESHOOTING – Ch. 7 and identify the cause.
Step 9 Check the correct functioning and settings changing – Ch. 6.4.1, 6.5.1., 6.5.2.

SAFETY INSTRUCTIONS

during installation

connections in SCU.
2
POWER OFF
and mount the 1 and 2 protection
to the ground.
10
).
POWER OFF
) from

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

2- familien3- familien

Inhaltsverzeichnis