3.2.2
Holding pressure
Turn on the device and press the Mode button to enter the HOLD PRESSURE inter-face.
Fill the system to be tested with an appropriate amount of nitrogen. When the pres-sure
reaches the set point, close the valve on the high pressure side.
Press the Start/Stop button to start the holding pressure test.
3.2.3
Refrigerant filling
Turn on the device and press the Mode button to enter the interface for the PT.
Connect the refrigerant tank to the middle interface.
Close the high-pressure valve and open the low-pressure valve.
Open the valve of the refrigerant line to fill refrigerant.
4
Accessories
You can find suitable accessories in the main catalog or at www.rothenberger.com
5
Customer service
The ROTHENBERGER service locations are available to help you (see listing in catalog or on-
line) and replacement parts and service are also available through these same service locations.
Order your accessories and spare parts from your specialist retailer or using RO SERVICE+
online: + 49 (0) 61 95/ 800 8200 sf + 49 (0) 61 95/ 800 7491 service@rothenberger.com -
www.rothenberger.com
10
ENGLISH