Herunterladen Inhalt Inhalt Diese Seite drucken

Zehnder Pumpen SWH 100 Betriebsanleitung Seite 10

Schmutzwasser-hebeanlage
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Contents:
Declaration of Conformity
1. General
1.1 Application
1.2 Queries and ordering
1.3 Technical data
1.4 Areas of application
2. Safety
2.1 Marking of information in the instruction for use
2.2 Personnel qualifications
2.3 Dangerous arising due to non-compliance with safety advice
2.4 Safety conscious working
2.5 Safety information for owner / operator
2.6 Safety information for maintenance, inspection and fitting
2.7 Non-manufacturer modification and spare part production
2.8 Unauthorised usage
3. Description
4. Transport and temporarily handling and storing
5. Installation and commencement of operation
6. Service / Maintenance
7. Warranty
8. Disposal
9.Technical Modification
10. Fault, possible reason and recovery
Appendix
Spare parts drawing/Spare part list
______________________________________________________________________________________________________
We the following
declare that the pump Series SWH and S-SWH conform the following specifications:
- Machine specification 2006/42/EG
- EEC-low voltage specifications 2014/35 EU
- EMV-Specifications 2014/30 EU
Applied harmonised norms, particularly
EN 60335-1:2012/A11:2014
EN 60335-2-41:2003/A2:2010
EN 809:1998/AC:2010
EN 55014-1:2006/A2:2011, EN 55014-2:1997/A2:2008
EN 61000-3-2:2014, EN 61000-3-3:2013
EN 61000-6-1:2007, EN 61000-6-2:2005, EN 61000-6-3/A1:2011, EN 61000-6-4/A1:2011
Grünhain-Beierfeld, 05.09.2016
Matthias Kotte
Product development manager
CAUTION Please remove all internal packaging material before
Declaration of Conformity
ZEHNDER Pumpen GmbH
Zwönitzer Straße 19
08344 Grünhain-Beierfeld,
installation!
10
page
10
11
11
11
11
12
12
12
12
12
12
12
13
13
13
13
13
13
14
14
15
15
15
16
GB
B

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

S-swh 100Swh 190S-swh 190Swh 170S-swh 170

Inhaltsverzeichnis