Herunterladen Inhalt Inhalt Diese Seite drucken

VEVOR ROPE-G-003 Benutzerhandbuch Seite 8

Inhaltsverzeichnis
lower leg straps around the foot.
Slide the cuff up or down along the leg iron until the upper edge of the cuff lies
approximately 1 3/4 in (4.4cm) below the knee. Mark the designated height.
Holding the cuff in place install one of the screws, recheck the adjustment and
install the second screw.
Reposition the cuff pad securely inside the cuff.
To check adjustment, bend knee in 90 deg angle, cuff should be as high as
possible on the shin without interfering with the bending of the leg.
Repeat with second climber.
Do not bend, cut, drill or otherwise modify the climbers. Anyone altering this
product assumes all risk of use.
PLANE TEST ACCORDINGTO ASTM F887 (Fig 2 & 3)
This test may be used to determine that the gaff is correctly shaped and
sharpened to properly penetrate the pole. Place the climber on a flat, soft pine or
cedar board. Holding it upright with the shank parallel to the board surface, but
with no pressure on the stirrup, push the climber forward along the board as
shown in figure below. If the gaff is properly shaped and sharpened and if the gaff
angle with the wood is sufficient, the gaff point will dig into the wood and begin to
7
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rope-g-004Rope-k-006

Inhaltsverzeichnis