Herunterladen Inhalt Inhalt Diese Seite drucken

Riello R40 GS20D Montage Und Bedienungs Anleitung Seite 26

Zweistufig
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

LINE OF GAS-SUPPLY
1
1
– Gas supply pipe
2
– Manual cock (charged to the installer)
3
– Gas pressure gauge (charged to the installer)
4
– Filter
5
– Gas pressure switch
6
– Safety valve
GAS TRAIN ACCORDING TO EN 676
MULTIBLOC
DUNGS
GAS TRAIN
MBZRDLE 407 B01
MBZRDLE 410 B01
The gas train is supplied separately, for its adjustment see the enclosed instructions.
POSITIONING ELECTRODE-PROBE
~
47 mm
Probe
D5104
2049
2
3
M1
CONNECTION
BURNER
Natural gas
Rp 3/4
Rp 3/4
LPG
Rp 3/4
Rp 3/4
Natural gas and LPG
Ignition electrode
4
5
6
7
7
– Pressure governor
8
– 1
M1 – Gas-supply pressure test point
M2 – Pressure coupling test point
EMPLOY
£
180kW
Diffuser
WARNING 2 – 3 mm
4
GB
8
M2
st
nd
and 2
stage adjusting valve
ALTERNATIVELY
RIELLO GAS TRAIN WITH:
Filter DUNGS GF 507/1
Governor DUNGS FRS 207/1
Pressure switch DUNGS GW 50 A4
Gas valves Riello (R.B.L.)
485SE, 487SE and 488SE
Ionization probe
Electrode
3,7
D5184
=
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

577t1

Inhaltsverzeichnis