6.
Connect L1 and N service wiring as shown.
7.
Torque the compression gland nut to 3.75 Nm (33.2 in-lb)
to ensure the IP54 rating.
Installing the Cover
Align the cover to the front of the main unit and turn the
screws to lock the cover into place.
Powering On
Power on the ChargePoint Gateway by switching the
service breaker ON.
As the ChargePoint Gateway powers on, the LED flashes
yellow as it attempts to communicate with the mobile
network. When network communication is established,
the LED is solid yellow.
If the Gateway continues to flash yellow for an extended
period, check the strength of the mobile signal at the
installation location. You may need to strengthen the
signal by installing network repeaters.