Contents of the Box
+
Main unit with cover (1)
+
1/4" drill bit (1)
+
#10 x 1" screws (5)
+
Wall anchors (5)
+
Compression gland (1)
+
Installation template (1) - inserted in the
centre of this installation guide
+
Spare activation label (1) - a duplicate label is
attached to the inside of the main unit
Contractor Tools
Wichtig
Keep the spare activation label. It contains critical information that you need
to pinpoint the gateway, which prepares it for activation on the ChargePoint
network. See
+
Drill
+
Phillips screwdriver
+
Two adjustable wrenches to remove the internal nut when permanently hard-wiring
Overview
1.
Installing the Gateway
2.
Installing the Cover
3.
Powering On
4.
Activating the Gateway
5.
Documenting the Radio Group
6.
Completing the Post-Installation Checklist
Activating the
Gateway.
ChargePoint Gateway Installation
85