English
ASSEMBLY
INSTRUCTIONS
In order to assemble
the staircase
hand. Remove all the parts of the staircase from the packaging and lay them on a large surface so that they are all visible.
Key: L = width
A = rise
All dimensions
are given in centimetres.
STAIRCASE
ASSEMBLY:
I) Calculation
of the rise (A)
Measure the height from the starting floor to the stair end landing floor HT (Fig. I). Subtract
height then divide the result obtained by the total number of steps, bearing in mind that the stair always finishes below the floor level
The value obtained must always be between 20 and 24 cm.
Example: (280-21) = 259
2) Calculation
of staircase dimensions
For the overall dimensions
3) Fixing of the staircase to the slab
Define the position of the landing support on the slab, respecting
Drill correspondently
to the holes in the plate with a Ø 14 mm drill and block the support to the slab using the proper expansion.
wooden floor/slab
use only screws for wood, of the hanger bolt/leg bolt type, to replace those provided.
4) Assembly
of the structure
Once having fixed of the landing support, assemble the next intermediate module to it, in correspondence with the holes using the appropriate
screws and washers.
Before securing the supports
measure of the rise to place the modules of the structure quickly without errors. Proceed
modules, then insert the plastic closure cap into each one (Fig.3). Place a provisional prop half way up the flight with a support post
(N.B.: Pay close attention when fitting the modules to ensure that they are perfectly aligned).
5) Fixing of the staircase to the floor
Complete the assembly of the supports till the starting module, ensuring that the staircase has been precisely positioned with respect to the
stair well, then mark out the points for fixing the plate to the floor. Drill holes using a Ø 14 mm bit and fix the starting module to the previous
intermediate
module, then securing the plate to the ground using the appropriate
use only screws for wood, of the hanger bolt / leg bolt type, to replace those provided
6) Fixing of the steps
Define the exact sequence of the steps, taking into consideration that the steps alternate. (For the staircase's exact configuration, refer to the
diagrams shown on page 19). Use the paper template supplied to make holes in the steps for the fixing of the modules in correspondence with
the bushes as shown in (Fig.4). Fix the steps to the supports
N.B.: Fix to the wall the step bracket in the middle of the flight, in order to make the stair stiff (Fig. 5a).
7) Mounting
the platform
For making the holes for a platform
assemble
the landing module with an intermediate
platform, then fix to the staircase structure.
N.B.: Orientate
the components
Position the platform above the structure
bushes as a reference point. Fix both step and structure using the appropriate self-threading screws (Fig. 8). The landing bracket is used to
support the staircase when the landing changes direction (Fig.9).
RAILING
ASSEMBLY:
N.B.: The stair has to be always assembled
8) Punching
of steps
and fixing
For a correct positioning
of the handrail,
The punching on the steps for fixing the railing must be carried out using the previously cut paper template, following the indications shown in
(Fig. 11). N.B.: On the landing step, position the punching closest to the floor, 2mm further towards the step so that there are 22mm from the
edge of the step to the punched hole (not 20 as normal punching carried out using the template would produce) (Fig. 12).
IMPORTANT! Once the position for the pawl screw has been defined on the step, make a hole using a Ø 4 mm bit with a depth of 3-4 cm
(Fig. 13). The pawl of the landing is fixed on an axis to the pawls components of the previous and next steps
9) Fixing of the balusters
Attach the "cima" connectors with its various components to all balusters as shown in (Fig. 14).
Starting from the bottom, provisionally
that the second and the third balusters
determines
the measurement
Secure the balusters using the appropriate screw (Fig. 17). Proceed with the assembly of all the intermediate balusters and close underneath
using the plastic caps. In order to provide the railing with greater rigidity, a further pawl, is applied to the last baluster, which should be fixed to
the slab (Fig. 18 - B and 19). In the case of wooden floor / slab use only screws for wood, of the hanger bolt / leg bolt type, to replace those
provided. In case there is an external railing (optional accessory) for the landing, see the diagrams shown in (Fig.21). The internal baluster of
the landing should be joined
10) Assembly
of the handrail
Assemble
the handrails
using the threaded
self-threading
screws as shown in (Fig. 14). Apply the caps to the ends of the handrail (Fig. 22 - C). To connect the handrail of the first flight to
the handrail of the second flight, use the baluster ring and fix it with the appropriate connector and handrail cap (Fig. 23 - D). Where a landing
is present, the external railing (optional accessory) should be connected as shown in (Fig. 24 - E).
11) Balustrade
(optional accessory)
The assembly
diagrams shown on page 15 (optional
27, 28 - G, 30 - H). In order to give greater rigidity to the section of balustrade that are more than one metre long, use the "colonna stop"
(optional accessory) as indicated in (Fig.29). In the case of wooden floor/slab use only screws for wood, of the hanger bolt/leg bolt type, to
replace those provided
12) Eventual
absence
of railing
The supports for the stiffening of the stair are composed by pieces of balusters of Y and W lenghts according to the calculated riser (Fig. YY)
and they have to be closed on the top and on the bottom with the proper plastic caps. The little supports
balusters of the railing.
"20120Rintal
S.p.a—Tutti i diritti riservati—All rights riserved"
with the greatest
possible ease, we advise you to begin the installation
HT = total height
(259:11) = 23.5
of the stair, consult the tables with the dimension
components
completely,
(optional
accessory)
(if present),
use the same template
module in order to make the complete
The platform cannot be placed at the starting or landing point of the staircase.
of the landing structure according
in correspondence
with the railing or with the little supports;
the pawls
refer to the diagrams
position the first, the second and the third balusters
are flush with the underside
to which the first baluster must be cut (Fig. 15), which will then be fixed to the floor using the bells (Fig. 16).
with a further baluster previously
rod and washer (Fig. 20 - A). Fix the balusters
accessory)
drawings
(page 20)
the rise A, previously
calculated
adjust the rise by sliding the part vertically.
in the same way with all the remaining
expanding
using the self-threading
screws in correspondence
as the straight step, referring to the previous shaped part. (Fig.6). First
landing structure (Fig.7). Tighten the bushes
to the sense of climbing of the stair.
with the previously
made holes, then trace out and drill holes using the other 4
shown in (Fig. 10), where the positions
inserting them into the pawls components,
of the step. Height X measured
cut to the right size (Fig.25 - F).
to the handrail
show the most common
types of assembly
4
with all the necessary
the value of the first fixed rise 21 from the total
ensuring
a good leveling of the step (Fig.2).
Carry out a spacer equal to the
tie-rods.
(Fig.3). In the case of wooden floor / slab
with the holes made (Fig.5).
the steps can't never be "free".
of the columns are shown.
between the second and the third baluster
by means of the appropriate
for any balusters
are got cutting to measure the
FM
equipment
on
In the case of
intermediate
ensuring
present (Fig.26,
MS
R4
12-12
MINI