Warning: 1. Current ONTAP version is 9.15.1
2. Verify that NVMEM or NVRAM batteries of the new nodes are charged,
and charge them if they are not. You need to physically check the new
nodes to see if the NVMEM or NVRAM batteries are charged. You can check
the battery status either by connecting to a serial console or using
SSH, logging into the Service Processor (SP) or Baseboard Management
Controller (BMC) for your system, and use the system sensors to see if
the battery has a sufficient charge.
Attention: Do not try to clear the NVRAM contents. If there is a need to
clear the contents of NVRAM, contact NetApp technical support.
3. If a controller was previously part of a different cluster, run
wipeconfig before using it as the replacement controller.
4. Note: This is not a MetroCluster configuration. Controller
replacement supports only ARL based procedure.
Do you want to continue? {y|n}: y
2. Drücken Sie y, Sie sehen die folgende Ausgabe:
Controller replacement operation: Prechecks in progress.
Controller replacement operation has been paused for user intervention.
Das System führt die folgenden Vorabprüfungen durch. Notieren Sie die Ausgabe jeder Vorabprüfung zur
Verwendung im weiteren Verlauf des Verfahrens:
Pre-Check
Cluster-Integritätsprüfung
Statusprüfung Der
Aggregatverschiebung
Modellname Prüfen
Cluster-Quorum-Prüfung
Beschreibung
Überprüft alle Nodes im Cluster, um sicherzustellen, dass sie sich in
einem ordnungsgemäßen Zustand befinden.
Überprüft, ob eine Aggregatverschiebung bereits erfolgt. Wenn eine
weitere Aggregatverschiebung erfolgt, schlägt die Prüfung fehl.
Überprüft, ob die Controller-Modelle bei diesem Verfahren
unterstützt werden. Wenn die Modelle nicht unterstützt werden,
schlägt die Aufgabe fehl.
Überprüft, ob die zu ersetzenden Nodes sich in Quorum befinden.
Wenn sich die Knoten nicht im Quorum befinden, schlägt die
Aufgabe fehl.