• This appliance is intended to be used in household and similar applications
kitchen
areas in shops, offices
in hotels,
motels
and other
ronments.
• Do not use outdoors.
• Save
these
instructions.
Steam
switch
2. Coffee
switch
3. Power
switch
Operation knob
4.
5. Metal
funnel
Cup shelf
6.
7. Water
tank
cover
8. Water
tank
9. Steam
wand
10. Frothing
nozzle
II. Drip tray
Control
panel
Steam
switch
2.
Coffee
switch
3.
Power
switch
Temperature
indicator
4.
5.
Operation
knob
Before
first
use
To ensure the first cup of coffee tastes excellent, you should rinse the coffee maker with
water
as follows:
• Open the water
tank cover, fill appropriate
not exceed
the "MAX"
Note: the appliance
the tank with water first,
• Set the steel
mesh into the metal
funnel
aligns
with the groove
from the "INSERT" position, and you can fix it into the coffee maker firmly by turning
anticlockwise
until it is at "LOCK"
• Place an espresso cup on the removable cup shelf, make sure the operation knob is on
the "O" position.
• Connect
to the power
cator will become
preheating.
• When the coffee indicator
operation knob to the
• After about one minute, turn the operation
can pour out the water
coffee.
Note: There may be noise when pumping the water for the first time, it is normal, the appli-
ance is releasing the air in the appliance. After about 20s, the noise will disappear.
and other working
residential
PARTS
OPERATING
mark in the tank, then replace
is supplied
with a detachable
and then attach
funnel
in the appliance,
position.
source,
press the power switch
blue and the coffee
becomes solid, it shows the preheating
position. Hot water will flow out.
in a container
then clean
environments;
type environments;
LIST
1
2
3
4
5
1
2
3
INSTRUCTIONS
water
into the water
the water tank cover.
tank for easy cleaning,
the tank into the appliance.
(without
coffee),
then insert
to turn on the unit. The power
indicator
will flash white.
knob to the "O" position to stop working, you
it thoroughly,
such as: staff
farm houses;
bed and breakfast
tank, water
level should
you can also fill
make sure the tube
the funnel
into the appliance
The appliance
is finished. Turn the
now you can start
ENGLISH
by clients
type envi-
6
7
8
9
10
11
4
5
on the
it
indi-
will start
making
7