Herunterladen Diese Seite drucken

Fronius OPT/i TPS Installationsanleitung Seite 18

Werbung

And finally...
3 Nm
1,5 Nm
18
7
1 0
8
4
5
3
4
4
3 Nm
Position the copper bracket over
7
the two plus sockets
Screw the 19 mm hexagon bolt
8
from the installation set scope of
supply into the 2nd plus socket:
copper bracket + washer + spring
washer
Screw the 19 mm hexagon bolt
9
from the original plus socket into
the existing plus socket:
copper bracket + power cable +
1 1
star + washer + spring washer
9
Tighten the hexagon bolt on the
10
2nd plus socket,
tightening torque = 15 - 35 Nm
Tighten the hexagon bolt on the
11
existing plus socket,
tightening torque = 15 - 35 Nm
Move the connection plate into the
1
correct position
4
3 Nm
Fix the mains cable strain-relief
2
device in place
Insert the connection plate
3
Fix the connection plate in place
4
with the five TX25 screws
4
Attach the sticker (+)
5
1,5 Nm
Carry out Safety inspection ac-
6
cording to Service Instructions
42,0426,0174

Werbung

loading