12
Installation
12 - 2 Fixation and Foundation of Units
RYYQ-T
RYMQ-T
RXYQ-T
12
Y ditch
NOTES
1. The proportions of cement: sand: gravel for the concrete shall be 1:2:4 and the reinforcement bars with a diameter of
10mm (approx, 300mm intervals) shall be placed.
2.
3.
4. A drain ditch shall be made around the foundation to thoroughly drain water from the equipment installation area.
5.
524
• Outdoor Unit • RYYQ-T
When building a
When building a
foundation on the
foundation on the
ground
Y
Y
ditch
ditch
X-X cross section
• VRV Systems • RYYQ-T
Spring washer
Foundation bolt executing method
Drain ditch
(Smooth down grade of 1/50)
Drain ditch
When installing multiple units in connection
Model
Floor
RYYQ8-12T
RYMQ8-12T
RXYQ8-12T
RYYQ14-20T
RYMQ14-20T
RXYQ14-20T
RXYCQ8
RXYCQ10-14
RXYCQ16-20
Foundation bolt type: JA
Size: M12
Nut
Four bolts are required
3 thread ridges or more
Frame
AA
AB
AC
766
992
113
1076
1302
497
697
792
992
100
1102
1302
AD
185
160
3D079547B