Herunterladen Inhalt Inhalt Diese Seite drucken

Installaton - Klarstein Bolero Smart Bedienungsanleitung

Deckenventilator
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN
22

INSTALLATON

Installation prepraton
To prevent personal injury and
damage, ensure that the hanging
location allows the blades a
clearance of 2.3m from the
floor and 76cm from any wall or
obstruction.
Be sure the outlet box is securely
attached to the building structure
and can support the full weight of
the fan.
Preparing the Fan Site
Downrod Installation
This fan can be mounted with a downdrod on a normal or vaulted ceiling.
The hanging length can be extended by a longer downdrod.
Installation requires these tools: Screwdriver, flat-head screwdriver, adjustable
pliers or wrench, stepladder, wire cutters, and rated electrical tape.
Standard Mounting hangs from the
ceiling by a downrod
76 cm
from wall
or nearest
obstructions
support brace
Angled Mounting recommended for
a vaulted or angled ceiling.
2.3 m
blades to floor
20°
support brace
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

10046058100460811004608210046083

Inhaltsverzeichnis