Herunterladen Inhalt Inhalt Diese Seite drucken

Argo-Hytos RPEX Gebrauchsanweisung Seite 16

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Cavity A2
Note:
Associated tools for production of ports can be ordered from the valve manufacturer (SMT catalogue 0019).Drawings of the ports are also available in
the same catalogue.
Unscrew the coil nut (4) by turning it counterclockwise. Remove the coil seal ring (3) and coil (2) from the control system.
The valve (1) is mounted in the chamber without the spool to prevent the valve from tightening in the chamber. Before inserting the valve into the
chamber in the block, ensure that undamaged seals are fitted to the valve housing. Also verify that the valve and chamber surfaces are not damaged
or contaminated. Before installing the valve, we recommend lightly lubricating the housing seals with grease or working fluid. Using slight pressure,
carefully insert the valve into the chamber and turn it clockwise to screw it in by hand. Then tighten the valve to 30 + 2 Nm using a torque wrench
(a = 24). Place the spool (2), spool seal (3) and fixing nut (4) back on the valve control system. Orient the spool by turning it on the control system so
that the cable outlet points in the required direction and secure the position of the spool by tightening the nut clockwise with a torque wrench
(a = 36) to 5 + 1 Nm.
2
1
Page 16
space for the radial
min. for side
bore
channel
AXIAL. BORE
24
1
30+2 Nm
(22.1+1.5 lbf.ft)
Cavity A3
2
Subject to change_SD1EX-A2(A3)_14088_1en_05/2022
space for the radial
min. for side
bore
channel
AXIAL. BORE
3
4
36
5+1 Nm
(3.7+0.7 lbf.ft)
www.argo-hytos.com
Inhaltsverzeichnis
loading

Inhaltsverzeichnis