Herunterladen Diese Seite drucken

Uponor Combi Port PRO Kurzanleitung Seite 3

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7
1 Installation and commissioning
1.1 General information
Warning!
Risk of electric shock if touching the components! The
unit operates with a 230 V AC voltage.
Warning!
Risk of electrical shock! Electrical installation and service
behind secured 230 V AC covers must be carried out
under the supervision of a qualified electrician.
Warning!
Uponor system power supply: 230 V AC, 50 Hz
In case of emergency, immediately disconnect the power.
Warning!
Prior to any work on the controller or the components
connected to it, switch off the controller according to the
regulations.
Warning!
The fittings are under pressure. Escaping pressurized
media can cause serious injury such as scalding or eye
damage.
Depressurise the system before performing any
installation work.
For retrofits to an existing system:
Drain the system or close the supply lines of the section
and depressurise it.
Warning!
Risk of injury due to the heavy weight of the unit:
Do not perform the installation alone.
Always wear safety shoes during the assembly. The unit
can be of considerable weight, depending on the
configuration. If the station falls over, this could lead to
injuries, particularly to the feet.
Caution!
Leaks in the unit may occur during transport or
installation. Check the nuts to ensure that they are
properly tightened before the connection to avoid
property damages.
Before installing the heat interface unit ensure that:
the primary pipes are laid in the building site.
the primary pipe installation is flushed and checked for leaks
the power and ground cables are routed to the installation site.
the unit can be installed in a dry and frost-free room with an
ambient temperature lower than +40 °C.
the unit can be mounted upright (not inclined, upside down or
lying down).
the unit is always easy to access even after the assembly.
Combi Port PRO
Related illustrations
Illustrations related to the different sections below are available
in the end of this document.
1.2 Heat interface unit
Note
See the dimensional drawings for measurements. All
dimensions are given in mm.
Follow the installation steps to install the heat interface unit.
1.
Dismount the frame and door
2.
Install the in-wall cabinet
3.
Install the connection rail
4.
Connect all pipes to the screw connections in the rail
5.
Install the heat interface unit
6.
Connect the heat interface unit with the connection rail
7.
Install the frame and door to the cabinet
1.3 Accessories
Note
The installation of accessories is described in the
installation and operation manual for Combi Port PRO.
Note
Visit the Uponor download centre for more information
regarding the installation and configuration of Uponor
Smatrix and Uponor Base flexiboard.
1.4 Other components/devices
A Water and heat measurement
Item
Description
HM
Heat meter
CW
Cold water meter
HW
Hot water meter
B Strainer
Caution!
Lock the unit and relieve the pressure before any work
with the strainer.
Combi Port PRO
Quick guide
EN
|
Quick guide
|
3

Werbung

loading